

There was ~ 2 feet of soil before the shale rock. Pilot holes were drilled for all Ground Screws.

This image features 2 Ground Screws connected with a 1″x8″ steel plate, tightened down against an existing concrete block.
There was ~ 2 feet of soil before the shale rock. Pilot holes were drilled for all Ground Screws.
This image features 2 Ground Screws connected with a 1″x8″ steel plate, tightened down against an existing concrete block.